Shimla/Rampur, Sept 3
The National Highway 05 has been made through at Browni (km 284/285) in Rampur Sub Division. However, continuous rainfall and sliding in the area are still posing challenges to smooth traffic movement.
Shimla/Rampur, Sept 3
The National Highway 05 has been made through at Browni (km 284/285) in Rampur Sub Division. However, continuous rainfall and sliding in the area are still posing challenges to smooth traffic movement.

Sign in to your account